Activities during the construction of structures, as well as major repairs and reconstruction of buildings, from January 1, 2009, are regulated by SROs - self-regulatory organizations. This system replaced the construction license.

If you are about to register a construction company or need to obtain SRO permission for an existing company of this profile, please contact the website. We will be happy to help and answer any questions.

What is SRO?

In order to carry out their activities in the Russian Federation, all construction companies are required to register with an SRO. The activities of the latter are regulated by the Urban Planning Code of the Russian Federation. No. 190-FZ dated December 29, 2004.

Non-profit partnerships receive SRO status in the field of construction and reconstruction, provided they meet a number of special requirements. All this allows us to talk about a new level of responsibility, management and control.

SRO goals

The fundamental goals of creating self-regulation in construction are:

  • informing about new changes in federal laws and standards;
  • increasing the competitiveness of SRO members;
  • consideration of conflicts and disputes between members of the SRO;
  • reducing the likelihood of causing property and physical harm caused by improper performance of their work by members of the SRO.

To achieve these goals, special requirements for documents for admission to construction work are developed and approved, their issuance is carried out, and compliance with all requirements and rules regulated by self-regulation, urban planning legislation, regulatory and technical documentation is monitored.

Certificates of permission to work

All organizations specializing in construction and members of a self-regulatory organization, before starting their activities, receive special documents containing data on the types of permitted work. SRO certificates of admission to work are divided into 3 types:

  1. for construction work,
  2. for engineering surveys,
  3. to carry out design work.

These documents contain information about permitted types of work and can be issued to construction organizations indefinitely and without territorial restrictions.

Permission to construction work may be terminated in the following cases:

  • exit of an organization or individual entrepreneur from an SRO,
  • detection of violations.

Advantages of SRO

Self-regulatory organizations, as well as the procedures for their creation and control, provide for the formation of compensation and insurance funds. This structure has already proven itself in solving many problems of both actively operating and newly registered construction companies and their clients.

The advantages of SRO are obvious. This:

  • improving the quality of construction work;
  • the possibility of paying damages from the compensation fund of an SRO or an insurance company and, as a result, reducing the number of conflict proceedings;
  • timely professional development of SRO members;
  • information support and support for construction activities.

Register the construction company correctly along with the website.

Joining the SRO

Our company will fill out all the necessary documents. To get started, we need to provide copies of the documents:
  • charter,
  • certificate of state registration,
  • registration certificate (OGRN),
  • order for the appointment of a director,
  • company details.
  • After receiving the original documents, we prepare the documents within 1-2 days and receive invoices for mandatory payments.

    After payment, the permit is ready within one day

    The following payment scheme is possible:

    To join a construction SRO you need to make mandatory payments:

    1. 300t.r - mandatory compensation fund established by law,
    2. 5t.r -Entry fee (one-time)
    3. 5t.r. - Membership fee per month.
    4. 5500r - insurance for 1 year,
    TOTAL: 315,500 rub.

    To join a design or survey SRO you need to contribute:

    1. 150t.r - mandatory compensation fund established by law,
    2. 5t.r - Entry fee
    3. 5t.r. - Membership fee for the first month (payment monthly)
    4. 5500r - insurance for one year
    TOTAL: RUB 165,500

    You can find out more detailed prices by studying our

    From July 1, 2017, the activities of construction companies are no longer subject to licensing. In accordance with Federal Law No. 240 “On Amendments to the Town Planning Code of the Russian Federation and certain legislative acts of the Russian Federation”, another tool is used to guarantee the quality and safety of work - access to self-regulatory organizations (SRO) of builders, designers and surveyors. These associations provide companies with documents confirming their competence to carry out certain work. The Business and Law company offers services for joining construction and other SROs, as well as providing any assistance in this matter. It is carried out in accordance with standard requirements and an approved list of works for which special permission is required. We offer you to buy an SRO permit, registration of which will take 1-3 days!

    Sample certificate

    Responsibility for performing work without SRO approval

    1. For carrying out work related to the safety of capital construction without the appropriate permission, the company faces a fine of 40,000 to 50,000 rubles.
    2. If the work caused major damage to individuals, legal entities or the state, while the contractor organization enriched itself in the amount of 1.5 to 6 million rubles, its manager may be punished:
      • a fine of up to 300 rubles or equal to the income of the convicted person for a period of up to 2 years,
      • correctional labor for up to 5 years,
      • imprisonment for up to 5 years and a fine.

    In this case, the legal entity is liquidated by court decision. If you are performing only construction work, just call the above phone number or use the feedback form and our specialists will call you back!

    Required documents

    Certificates of tax registration and OGRN.

    An extract from the Unified State Register of Legal Entities, issued no later than 30 days before submitting documents.

    Letter of registration in the statistical register of Rosstat.

    Charter and decision on the appointment of the head of the organization.

    Information about the professional qualifications of employees.

    You can quickly apply for and obtain permission for your company only if you provide all of the above papers. They are then submitted to a self-regulatory organization, which prepares a response package of documents for the candidate. Do you urgently need to obtain a ready-made SRO permit at an affordable price, but do not have the time or desire to independently understand all the legislative nuances?

    Specialists of the company “Business and Law” provide assistance in joining an SRO in Moscow for the most popular services: general contracting, major repairs, electrical installation and hazardous work.

    We guarantee 100% compliance with legal regulations, professional support and cooperation only with proven and reliable non-profit partnerships in Moscow.

    I used the services of the company “Business and Law”. I would like to note the efficiency and quality of work of its employees. They issued admission to the SRO, as promised, in one day. There were no problems or surprises associated with additional payment for the work.

    Oleg Ilyasov.

    It was necessary to obtain SRO approval for construction on the allocated site. The matter was complicated by the fact that the deadlines were very tight. It’s good that the partners helped - they had already encountered such a problem, and that’s why they sent me to your company. Thanks to your team for your efficiency and accuracy. You helped out a lot!

    LLC "BusinessStroyMat"

    read also

    For certain types of work, a building permit is not required. Whether an SRO permit is needed for your organization can be determined by reading the list below.

    These types of work do not require SRO approval for two reasons:

    • if they are carried out at simple objects and NOT carried out at particularly dangerous, technically complex and unique objects.
    • if these works, in principle, do not relate to capital construction. The list of types of work related to capital construction can be found in Order 624 of the Ministry of Regional Development dated December 30, 2009. Types of work NOT related to cap. construction listed on this page are compiled “in reverse”, referring to order 624 and are not prescribed anywhere in the legislation.

    List of types of work that do not affect the safety of capital construction projects and for which SRO approval is not required

    1.1.1. Installation of electric lighting systems for temporary buildings.

    1.1.2. Installation of temporary protective fences.

    1.1.3. Geodetic alignment basis for construction.

    1.1.4. Geodetic control of the accuracy of geometric parameters of buildings (structures).

    1.1.5. Staking out work during the construction process (permission is required only when working on particularly dangerous objects).

    1.1.6. Cleaning of premises and territory (cleaning) after construction and repair work

    1.2. Work on demolition of buildings and dismantling of structures:

    1.2.1. Dismantling (dismantling) of buildings and structures, walls, ceilings, flights of stairs, platforms, steps, dismantling of window, door and gate openings, partitions, suspended ceilings and other structural and related elements or parts thereof. (permission is required only when working on especially dangerous objects).

    1.2.2. Breaking down walls, massifs, ceilings, punching nests.

    1.2.3. Dismantling of the ground part of industrial buildings.

    1.2.4. Dismantling of sidewalks, floors, roofing and cladding.

    1.2.5. Dismantling of industrial furnaces.

    1.2.6. Dismantling the lining of tunnels made of cast iron tubes.

    1.2.7. Dismantling of metal columns, beams and frames.

    1.2.8. Dismantling of contact network supports.

    1.2.9. Clearing areas and preparing them for development.

    1.2.10. Installation and dismantling of inventory external and internal scaffolding, technological waste chutes (permission is required only when working at particularly hazardous facilities).

    1.2.11. Construction of temporary: roads; platforms; engineering networks and structures.

    1.3. Work on the development of excavations, vertical planning, compaction of natural soils and installation of soil cushions:

    1.3.1. Excavation of soil with excavators in excavations, ditches, trenches and dumps or embankments.

    1.3.2. Excavation of soil using excavators with loading onto rail or road transport and removal.

    1.3.3. Development and movement of soil using bulldozers and scrapers.

    1.3.4. Digging holes using a mechanized method, digging trenches with an excavator and a ditch digger.

    1.3.5. Paving slopes with stones and slabs with stops.

    1.3.6. Strengthening drainage channels with trays - gutters, boards, shields and mats with caps.

    1.3.7. Soil compaction with rollers, soil compaction machines or heavy rammers.

    1.3.8. Loosening of frozen soil with a wedge - a woman, rippers and drilling rigs.

    1.3.9. Backfilling of soil manually with compaction using electric or pneumatic rammers.

    1.4. Work on the construction of subsidence wells and caissons:

    1.4.1. Lowering a well with mechanized soil development.

    1.4.2. Lowering the well manually.

    1.5.1. Assembly of residential and public buildings from factory-produced parts supplied as a complete set.

    1.5.3. Assembly of coverings and ceilings.

    1.5.4. Installation of wooden structures, frames, rafters, chairs, beams, arches, trusses and panels.

    1.5.5. Installation of canopies, backlash - closets, fire boxes, tables.

    1.5.6. Installation of rows, construction and development of slipways.

    1.5.7. Installation of conductors, ladders, walking boards, barriers.

    1.5.8. Construction of walls from wooden structures and parts.

    1.6. Work on installation of light enclosing structures:

    1.6.1. Installation of wood concrete and asbestos cement slabs and wall panels, coverings.

    1.6.2. Construction of walls, ceilings, partitions and umbrellas from asbestos-cement sheets on a finished frame.

    1.6.3. Installation of sprinkler blocks made of asbestos-cement sheets.

    1.7. Work on the installation of stone structures:

    1.7.1. Construction of brick structures, including those with cladding (permission is required only when working on particularly dangerous objects).

    1.7.2. Installation of partitions made of brick, ceramic stones, piece gypsum and lightweight concrete slabs.

    1.7.3. Installation of jumpers.

    1.7.4. Construction of building structures and structures made of natural and artificial stones, including cladding (permission is required only when working on particularly dangerous objects).

    1.7.5. Laying walls from ceramic stones, foam concrete, aerated concrete and expanded clay concrete blocks.

    1.7.6. Masonry of structures made of natural and artificial stone.

    1.7.7. Installation of frames and formwork for laying arches, vaults and walls of industrial furnaces.

    1.7.8. Laying foundations, basement walls, retaining walls, filling excavations with rubble stone.

    1.7.9. Brickwork of channels, pits, furnaces, hearths, chimneys with grooves.

    1.8. Work on shielding premises and installing expansion joints:

    1.8.1. Sealing horizontal and vertical joints and seams between panels, windows, doors.

    1.8.2. Construction of expansion and anti-seismic joints.

    1.8.3. Shielding floors, walls, doors, ceilings with copper or steel sheets and mesh.

    1.8.4. Installation of protective steel mesh.

    1.8.5. Covering the walls and roofs of mines with sheet steel.

    1.9.1. Installation of roofs from piece and sheet materials (permission is required only when working on particularly dangerous objects).

    1.9.2. Installation of self-leveling roofs (permission is required only when working on particularly dangerous objects).

    1.9.3. Installation of asbestos-cement roofs.

    1.9.4. Installation of tile roofs with sheathing.

    1.9.5. Installation of roll roofs (permission is required only when working on particularly dangerous objects).

    1.9.6. Installation of roofs made of bitumen mastic with fiberglass mesh or fiberglass laying.

    1.9.7. Installation of small roofing coverings and linings on facades made of roofing iron.

    1.9.8. Installation of gutters with overhangs and roof railings.

    1.9.9. Primer of bases and vapor barrier device.

    1.10. Work on anti-corrosion protection of building structures and equipment:

    1.10.1. Painting surfaces with varnishes, paints, enamels.

    1.10.2. Painting of steel structures, including bridges, supports, masts, towers.

    1.10.3. Hydrophobization and fluation of the surface.

    1.10.4. Impregnation of crushed stone with “BITUMINOL N-2” mastic.

    1.11. Work on thermal insulation of building structures, pipelines and equipment:

    1.11.1. Work on thermal insulation of pipelines.

    1.11.2. Coating the surface of pipeline insulation with asbestos-cement casings, glass cement, fiberglass, fiberglass.

    1.11.3. Covering the surface of pipeline insulation with sheet metal or aluminum corrugated sheets.

    1.11.4. Coating the surface of pipeline insulation, wrapping and gluing the insulation with films, fabrics, and roll materials.


    1.12. Do I need an SRO permit for plumbing work? Work on the installation of internal engineering systems and equipment that does not require SRO approval:

    1.12.1. Laying internal electrical wiring.

    1.12.2. Construction of a power supply system with voltage up to 1 kV inclusive.

    1.12.3. Installation of input distribution device.

    1.12.4. Installation of distribution and lighting panels, terminal boxes and taps.

    1.12.5. Installation of cabinets, consoles, shelving.

    1.12.6. Installation of switches, switches, air circuit breakers, plug-in devices.

    1.12.7. Installation of ballast and guide equipment.

    1.12.8. Installation of electrical appliances and meters.

    1.12.9. Installation of grounding conductors.

    1.12.10. Installation of insulators.

    1.12.11. Laying cables secured with cables or brackets.

    1.12.12. Installation of electrical and other networks for controlling life support systems of buildings and structures.

    1.12.13. Installation of a lightning rod, cable platform, hatches, steps, control and breaking point on the supports and roofs of buildings.

    1.12.14. Installation of lightning protection parts for radial and loop grounding.

    1.12.15. Installation of short circuiters, disconnectors, switches, arresters for voltages up to 750 kV.

    1.12.16. Installation of batteries, alkaline batteries with charging.

    1.12.17. Installation of electric heating devices, electric stoves.

    1.12.18. Installation of embedded and selected devices for automation systems, fire extinguishing installations, equipment for grease lubrication systems.

    1.12.19. Filling containers with foaming agent.

    1.12.20. Installation of fans and ventilation units, supply irrigation chambers, maintenance, leveling, recirculation.

    1.12.21. Installation and dismantling of ventilation and air conditioning systems.

    1.12.22. Installation of heaters and air heaters.

    1.12.23. Installation of filters, scrubbers, cyclones.

    1.12.24. Installation of air collectors made of steel pipes and air vents and hydraulic valves.

    1.12.25. Installation and dismantling of the heating system.

    1.12.26. Installation of heating water-heating and steam-water-heating boilers.

    1.12.27. Installation of heating cast iron sectional steam boilers.

    1.12.28. Installation and dismantling of water supply and sewerage systems.

    1.12.29. Laying pipelines from plastic and metal-plastic pipes.

    1.12.30. Laying pipelines made of non-ferrous metals and cast iron.

    1.12.31. Laying pipelines from steel pipes, with welding of joints and installation of bends.

    1.12.32. Laying pipelines from steel pipes with flanges and welded joints from ready-made units and parts.

    1.12.33. Installation of shut-off, control and safety valves on internal networks.

    1.12.34. Installation of water metering units, metering units and water meters.

    1.12.35. Installation of compensators.

    1.12.36. Installation of elevator units.

    1.12.37. Installation of indicating instruments (pressure gauges, thermometers, level indicators, air valves).

    1.12.38. Installation of pressure and pressure regulators.

    1.12.39. Installation of centrifugal pumps with piping.

    1.12.40. Installation of filters, water and oil separators, compensators, and bypass devices when laying pipelines.

    1.12.41. Installation of water filters, softening devices and adjustment of water composition.

    1.12.42. Installation of high-speed and capacitive water heaters, installation of boilers.

    1.12.43. Insertion and connection of pipelines into existing highways.

    1.12.44. Installation of risers in finished channels on floors with installation of panels.

    1.12.45. Installation of steam and water distribution combs made of steel pipes.

    1.12.46. Installation of distribution boxes, equipment suction, brackets, stands, vibration-isolating bases, valves, dampers, sealed doors and hatches.

    1.12.47. Inserting fittings and tees into existing networks, disconnecting and plugging gas pipelines (if there are specialists who have received permission from Rostechnadzor for this type of activity).

    1.12.48. Testing of hydraulic and pneumatic pipelines in compliance with the requirements of Rostechnadzor for this type of activity.

    1.13. Work on installation of external engineering networks and communications:

    1.13.1. Construction of power supply networks with voltage up to 1 kV inclusive.

    1.13.2. Installation of external communication lines, including telephone, radio and television.

    1.13.3. Construction of pipelines using horizontal directional drilling.


    1.14. Do I need SRO approval for installation work? Work on the installation of technological equipment that does not require SRO approval:

    1.14.1. Installation of electrical installations.

    1.14.2. Installation of compressor machines, pumps, general purpose pumping units and fans.

    1.14.3. Installation of compressor units and piston and centrifugal expanders.

    1.14.4. Installation of ventilation equipment.

    1.14.5. Installation of communication equipment, telephone exchanges and switches of the MB system for director, dispatch and institutional communications and telephone and quasi-telephone exchanges.

    1.14.6. Installation of instruments, automation and computer equipment.

    1.14.7. Installation of indicators, sensors, signaling devices for various parameters.

    1.14.8. Installation of operational monitoring and control equipment, collection and transmission of initial information.

    1.14.9. Installation of panels, shields, tripods, remote controls.

    1.14.10. Installation of video surveillance systems.

    1.14.11. Installation of access control and restriction systems.

    1.14.12. Installation of electrical alarm, fire, calling and remote alarm equipment with blocking surfaces.

    1.14.13. Installation of equipment for agricultural production.

    1.14.14. Installation of equipment for food industry enterprises.

    1.14.15. Installation of equipment for communications industry enterprises.

    1.15.16. Installation of communication equipment for mines and railway transport.

    1.15.17. Installation of equipment for electronic industry enterprises.

    1.15.18. Installation of equipment for enterprises and objects of consumer services and public utilities.

    1.15.19. Installation of equipment for healthcare institutions and medical industry enterprises.

    1.15.20. Installation of equipment for cinematography enterprises.

    1. 15. Is SRO approval required for commissioning? Commissioning work for which SRO approval is not required:

    1.15.1. Commissioning of electrical devices.

    1.15.2. Commissioning of automation in power supply.

    1.15.3. Commissioning of automated control systems, alarms and interconnected devices.

    1.15.4. Commissioning of computer software.

    1.15.5. Commissioning work for autonomous adjustment of systems.

    1.15.6. Commissioning works for complex adjustment of systems.

    1.15.7. Commissioning and testing of ventilation and air conditioning systems.

    1.15.8. Commissioning of refrigeration units.

    1.15.9. Commissioning of thermal power equipment.

    1.15.10. Commissioning works of hot water heating boilers.

    1.15.11. Commissioning of boiler room and auxiliary equipment.

    1.16. Do I need SRO approval for glazing? Glazing work that is not required:

    1.16.1. Installation of window and door blocks.

    1.16.2. Double and triple glazing, including double glazed windows, window and balcony blocks.

    1.16.3. Single glazing, including double glazed windows, greenhouses, industrial buildings and partitions.

    1.16.4. Glazing of door panels and stained glass windows with display glass.

    1.16.5. Covering roofs, walls, partitions with polymer materials.

    1.16.6. Arrangement of entrance groups.

    1.16.7. Installation of office partitions.

    1.17. Do I need SRO approval for finishing and plastering work? The work listed below does not require SRO approval:

    1.17.1. Plastering of internal and external surfaces of buildings.

    1.17.2. Continuous leveling and preparation of surfaces for painting or wallpapering.

    1.17.3. Plastering facade surfaces on stone and concrete.

    1.17.4. Plastering stoves with clay mortar.

    1.17.5. X-ray protective plaster and screed.

    1.18. Construction of bases, coverings and floors:

    1.18.1. Screed device.

    1.18.2. Installation of linoleum and plastic floors.

    1.18.3. Installation of parquet, panel and plank floors.

    1.18.4. Installation of floors made of ceramic, porcelain stoneware, granite and marble slabs.

    1.18.5. Installation of seamless, polymer, polymer-cement floors.

    1.18.6. Installation of epoxy self-leveling floors.

    1.18.7. Installation of sports floor coverings.

    1.18.8. Construction of artificial turfs and sports surfaces for stadiums and sports fields.

    1.18.9. Installation of floors and window sills from concrete and mosaic tiles.

    1.18.10. Installation of cobblestone and paving stone coverings.

    1.18.11. Construction of soil foundations, earthen and crushed stone coverings.

    1.18.12. Installation of floors made of cast iron and steel stamped tiles.

    1.18.13. Construction of asphalt concrete and xylolite coatings.


    1.19. Do I need SRO approval for facing work? This list of cladding works does not require SRO approval:

    1.19.1. Surface cladding with gypsum and gypsum fiber sheets.

    1.19.2. Surface cladding with ceramic tiles.

    1.19.3. Surface cladding with marble, artificial marble, granite, artificial granite.

    1.19.4. Installation of suspended ceilings.

    1.19.5. Wall cladding with siding.

    1.19.6. Wall cladding with composite materials and plastic.

    1.19.7. Wall cladding with wall and ceiling panels, lining, false beams.

    1.19.8. Covering stoves and hearths with tiles.

    1.19.9. Cladding of wall and ceiling frames with acoustic slabs and materials.

    1.19.10. Cladding the surfaces of walls, columns, pilasters with natural and artificial stone.

    1.19.11. Cladding the surfaces of walls and ceilings with chipboard, fiberboard and plywood.

    1.19.12. Cladding walls and ceilings with duralumin sheets.

    1.19.13. Work on the installation of walls made of SANDWICH panels and sheet assembly.

    1.19.14. Installation of ventilated facades.

    1.20. Do you need it for stucco work? The ones listed below - no.

    1.20.1. Installation of polymer, gypsum and cement moldings.

    1.20.2. Installation of polymer, gypsum and cement piece parts, rosettes, capitals, bases, cones, crackers, brackets, grilles, vases, coats of arms.

    1.21. Other finishing, painting and wallpaper works:

    1.21.1. Installation of doors, design of doorways.

    1.21.2. Installation of suspended ceilings.

    1.21.3. Installation of commercial equipment, shelving and fencing.

    1.21.4. Arrangement of warehouse equipment.

    1.21.5. Installation of lamps and lighting equipment.

    1.21.6. Installation of external lighting devices for buildings and structures.

    1.21.7. Installation of plumbing fittings.

    1.21.8. Installation of sanitary partitions.

    1.21.9. Installation of safes.

    1.21.10. Painting of facades and external surfaces of buildings.

    1.21.11. Painting of external surfaces of reinforced concrete structures.

    1.21.12. Indoor painting.

    1.21.13. Pasting walls, ceilings with wallpaper, linkcrust, fabrics, cork and other materials

    1.22. Is SRO approval required for the installation of fences and fencing? The installation of fences on the list does not require SRO approval

    1.22.1. Installation of manual, mechanical and automatic barriers, gates, wickets, turnstiles, chain barriers.

    1.22.2. Construction of protective and decorative fences, fences, gates from various materials except for protective fences and elements of the construction of highways and enclosing structures of buildings and structures.

    1.22.3. Installation of protective and protective-decorative window fencing.

    1.22.4. Installation of snow shields and fences with their production.

    1.22.5. Installation of additional reinforced concrete pillars.

    1.23. Landscaping, protective and fruit plantings, landscaping:

    1.23.1. Planting trees and shrubs with preparation of planting sites and planting material.

    1.23.2. Planting seedlings and seedlings.

    1.23.3. Forest planting of seedlings and saplings is mechanized.

    1.23.4. Construction of lawns, flower beds and their care.

    1.23.5. Aeroseeding of coniferous trees.

    1.23.6. Caring for trees and shrubs.

    1.23.7. Soil cultivation, including the application of fertilizers.

    1.23.8. Installation of watering and irrigation systems.

    1.23.9. Installation and dismantling of trellises, racks, posts, anchors and braces.

    1.23.10. Covering terraces with wood and composite decking.

    1.23.11. Construction of greenhouses from various materials.

    1.23.12. Arrangement of children's playgrounds, places of leisure and recreation, public places.

    1.23.13. Installation of small architectural forms, fountains, artificial reservoirs.

    1.23.14. Construction of waste container sites.

    1.24. Construction of road bases and surfaces with the exception of highways and airfields:

    1.24.1. Construction of cobblestone and mosaic pavements, platforms, paths

    1.24.2. Construction of concrete slab sidewalks and paths

    1.24.3. Installation of leveling layers of asphalt

    1.24.4. Construction of bases and coatings from asphalt concrete mixture

    1.24.5. Construction of cement-concrete bases and coatings

    1.24.6. Installation of side stones

    1.24.7. Blind area device

    1.24.8. Current repairs and maintenance of roads

    1.24.9. Construction of bases and coatings made of sand and gravel mixture

    1.24.10. Construction of crushed stone bases and coverings

    1.24.11. Construction of soil-bitumen and soil-cement bases and coatings

    1.24.12. Natural stone paving

    1.25. Does the customer need SRO approval? Work on organizing construction, reconstruction and major repairs by a legal entity or individual entrepreneur (general contractor) attracted by the developer or customer on the basis of a contract, for which SRO approval is not required:

    1.25.1. Light industry enterprises and facilities

    1.25.2. Food industry enterprises and facilities

    1.25.3. Enterprises and facilities of agriculture and forestry

    1.25.4. Enterprises and public transport facilities

    1.26. Construction engineering:

    1.26.1. Drawing up estimates for construction and calculations of the estimated cost of the object

    APPENDIX No. 2

    CONSTRUCTION, RENOVATION AND MAIN REPAIR WORKS OF CONSTRUCTION FACILITIES, CARRIED OUT EXCLUSIVELY AT THE FOLLOWING FACILITIES, THE CUSTOMER DOES NOT HAVE THE RIGHT TO REQUEST SRO approval

    • construction of a garage on a land plot provided to an individual for purposes not related to business activities, or construction on a land plot provided for gardening, dacha farming (Objects for which the issuance of a construction permit is not required in accordance with Part 17 of Article 51 of the Town Planning Code Code of the Russian Federation);
    • construction, reconstruction of objects that are not capital construction projects (kiosks, sheds and others) (Objects for which the issuance of a building permit is not required in accordance with Part 17 of Article 51 of the Town Planning Code of the Russian Federation);
    • construction on a land plot of buildings and structures for auxiliary use (Objects for which the issuance of a building permit is not required in accordance with Part 17 of Article 51 of the Town Planning Code of the Russian Federation);
    • changes to capital construction projects and (or) their parts, if such changes do not affect the structural and other characteristics of their reliability and safety and do not exceed the maximum parameters of permitted construction, reconstruction established by the town planning regulations (Objects for which the issuance of a construction permit in accordance with part 17 of article 51 of the Town Planning Code of the Russian Federation);
    • in other cases, if in accordance with the Town Planning Code of the Russian Federation, the legislation of the constituent entities of the Russian Federation on town planning activities, obtaining a construction permit is not required (Objects for which the issuance of a construction permit is not required in accordance with Part 17 of Article 51 of the Town Planning Code of the Russian Federation);
    • individual housing construction projects (detached residential buildings with no more than three floors, designed to accommodate no more than two families) (Clause 2 of Order of the Ministry of Regional Development of the Russian Federation dated December 30, 2009 N 624);
    • residential buildings with no more than three floors, consisting of several blocks, the number of which does not exceed ten and each of which is intended for one family, has a common wall (common walls) without openings with the neighboring block or neighboring blocks, is located on a separate plot of land plot and has access to public territory (blocked residential buildings) (Clause 2 of Order of the Ministry of Regional Development of the Russian Federation dated December 30, 2009 N 624);
    • apartment buildings with no more than three floors, consisting of one or more block sections, the number of which does not exceed four, each of which contains several apartments and common areas and each of which has a separate entrance with access to the common area ( Clause 2 of the Order of the Ministry of Regional Development of the Russian Federation dated December 30, 2009 N 624)


    2.1. Do I need SRO permission for excavation work? Excavation work for which SRO approval is not required:

    2.1.1. Soil development using hydromechanization method.

    2.1.2. Work on artificial freezing of soils.

    2.1.3. Mechanized loosening and development of permafrost soils.

    2.1.4. Laying drainage pipes on construction sites.

    2.2. Piling works. Soil consolidation:

    2.2.1. Piling work carried out from the ground, including in sea and river conditions.

    2.2.2. Piling work carried out in frozen and permafrost soils.

    2.2.3. Arrangement of grillages.

    2.2.4. Installation of driven and bored piles.

    2.2.5. Thermal strengthening of soils.

    2.2.6. Cementation of soil bases with driving of injectors.

    2.2.7. Silication and resinization of soils.

    2.2.8. Driving and lifting of steel and sheet piles.

    2.3. Construction of concrete and reinforced concrete monolithic structures:

    2.3.1. Formwork works.

    2.3.2. Reinforcement works.

    2.3.3. Construction of monolithic concrete and reinforced concrete structures.

    2.4. Installation of prefabricated concrete and reinforced concrete structures:

    2.4.1. Installation of foundations and structures of the underground part of buildings and structures.

    2.4.2. Installation of structural elements of the above-ground part of buildings and structures, including columns, frames, crossbars, trusses, beams, slabs, chords, wall panels and partitions.

    2.4.3. Installation of volumetric blocks, including ventilation blocks, elevator shafts and garbage chutes, sanitary cabins.

    2.5. Installation of metal structures:

    2.5.1. Installation, strengthening and dismantling of structural elements and enclosing structures of buildings and structures.

    2.5.2. Installation, strengthening and dismantling of tank structures.

    2.5.3. Installation, strengthening and dismantling of mast structures, towers, exhaust pipes.

    2.5.4. Installation, strengthening and dismantling of technological structures.

    2.5.5. Installation and dismantling of cable-supporting structures (braces, cable-stayed structures, etc.).

    2.6. Protection of building structures, pipelines and equipment (except for main and field pipelines):

    2.6.1. Lining works.

    2.6.2. Masonry made of acid-resistant bricks and shaped acid-resistant ceramic products.

    2.6.3. Gumming (lining with sheet rubber and liquid rubber mixtures).

    2.6.4. Installation of adhesive insulation.

    2.6.5. Installation of metallization coatings.

    2.6.6. Applying a facial coating when installing a monolithic floor in rooms with aggressive environments.

    2.6.7. Antiseptic treatment of wooden structures.

    2.6.8. Waterproofing of building structures.

    2.6.9. Work on thermal insulation of buildings, building structures and equipment.

    2.6.10. Work on fire protection of building structures and equipment.

    2.7. Installation of internal engineering systems and equipment of buildings and structures (at the above facilities):

    2.7.1. Installation and dismantling of the gas supply system (if there is a specialist who has received permission from Rostechnadzor for this type of activity).

    2.8. Installation work (at the above sites):

    2.8.1. Installation of lifting and transport equipment.

    2.8.2. Installation of elevators.

    2.8.3. Installation of boiler room equipment.

    2.8.4. Installation of water intake equipment, sewerage and treatment facilities.


    2.9. Do you need an SRO approval for construction control? Work to carry out construction control by a legal entity or individual entrepreneur engaged by the developer or customer on the basis of a contract (at the above sites), where SRO approval is not required:

    2.9.1. Construction control of general construction works.

    2.9.2. Construction supervision of work in the field of heat and gas supply and ventilation.

    2.9.3. Construction control of work in the field of fire safety.

    2.10. Work on organizing construction, reconstruction and major repairs by a legal entity or individual entrepreneur (general contractor) attracted by the developer or customer on the basis of an agreement (at the above facilities):

    2.10.1. Housing and civil construction.

    2.10.2. Heat supply systems.

    2.10.3. Gas supply systems.

    2.10.4. Water supply and sewerage systems.

    Read 2080 times

    Since the state licensing system for construction activities in the Russian Federation was replaced by the institution of self-regulatory organizations, almost all representatives of this industry have become participants in professional non-profit partnerships. Thus, having received SRO construction permits - permission to perform specific work related to capital construction. The new mechanism provided for the opportunity for each market participant to become a representative of several SROs at the same time (with an eye to the types of work performed by its personnel). Also, at the legislative level, a list of activities was approved for the implementation of which it is important to have special permits provided as confirmation by the general meeting of members of a self-regulatory organization of the competence of a particular company.

    Types of SRO approvals

    At the moment, the following types of SRO approvals in construction have been approved (according to the order of the Ministry of Regional Development of the Russian Federation No. 624 dated December 30, 2009):

    • geodetic and preparatory activities;
    • excavation, drilling and blasting and piling works;
    • creation and arrangement of wells;
    • formation of concrete/reinforced concrete monolithic structures (device + installation);
    • work with stone, wood, metal structures;
    • façade and roofing measures;
    • protection of building structures, equipment, pipelines;
    • installation and dismantling of engineering networks and communications (internal and external);
    • construction of special facilities (oil and gas industry, nuclear energy);
    • various installation and commissioning works;
    • construction of communication routes (roads, railways, takeoffs, underground, trams, overpasses);
    • hydraulic engineering measures (including diving);
    • masonry and installation, arrangement of furnaces;
    • organizational procedures involving the developer/customer/general contractor;
    • execution of construction control.

    If a new company plans to operate in one of these areas, it will have to join a construction SRO from scratch. The same applies to enterprises that have been working in the industry for a long time, but are planning to expand the list of their services to include new types of activities. The SRO construction company receives unlimited powers and can take on any projects within the scope of its clearance. I would like to remember that there are still a number of works.

    How to obtain SRO permission for construction work?

    Obtaining a construction permit is only possible for companies that are willing to meet the professional standards set by the non-profit partnerships they plan to join. To obtain a full SRO permit in construction you will need:

    • decide on a specific self-regulatory structure in the region where the activity is planned;
    • collect a package of documents (application, information sheet, copies of certificates and licenses, registration data of a legal entity, records from the Unified State Register of Legal Entities, constituent papers, documents confirming the competence of management and staff, as well as indicating that the entrepreneur has the proper material base, insurance policies, etc. .); pay all fees provided for by the legislation of the Russian Federation and the charter of the SRO;
    • take care to ensure that the level of education and competence of the company’s personnel meets the requirements set by a specific construction SRO (even to the point of sending employees to advanced training courses);
    • confirm the seriousness of intentions by purchasing equipment, renting premises, providing other logistical grounds for activity;
    • submit an application to join the SRO of construction activities.

    The price for joining a construction SRO may vary depending on the policy of each professional association. As a rule, it consists of one-time payments (starting payment, deduction to the compensation fund, payment for document processing) and regular payments (membership fees). The amounts for each of these categories of expenses are determined by each SRO separately and are prescribed in their charters. Despite the fact that initial payments usually amount to hundreds of thousands of rubles, this investment is very justified. Having an SRO certificate in hand, a construction company will be able to quickly recoup the costs of obtaining permission, since it automatically becomes a desirable contractor for many customers, receives the right to participate in tenders, and engage in any capital activities. For companies that will help with admission in your region, see